All Categories
EN

Home>Products>Sintering Furnace Series

5
Tungsten Cemented Carbide Custom Ultra-high Speed  Cooling Pressure Sintering Furnace

Tungsten Cemented Carbide Custom Ultra-high Speed Cooling Pressure Sintering Furnace


A special 2MPa pressure furnace with 2hrs extra-fast cooling function has been developed to meet with heat treatment requirement of cemented carbide.
Suitable for production of gradient cemented carbide.

Especially suitable for sintering CNC inserts, and heat treatment for mining carbide tools. It can reduce the volatilization of cobalt and create about 50μm  non-β phase layer on the surface of cemented carbide inserts, to achieve good toughness and high bonding strength with the coating, which can greatly improve the anti collapse toughness and cutting life of the coated inserts.

Contact us
Feature

The extra-fast cooling for function is added on the basis of sinter HIP furnace.

Cooling from 1400℃ to 100℃ in less than 2h under full charge.

Shorter cooling time, higher productivity.



Code Rule                             GPSF ◇X◇-◇ MPa
Value of Pressure
Effective Working Length (cm) 60, 90, 120, 180
Effective Working Width (cm) 30, 40, 50, 55, 60
Gas Pressure Sintering Furnace


Technical Parameters


ModelEffective Zone (mm)Effective Volume Max.Temp. ()Pressure(MPa)Ultimate Vacuum(Pa)Capacity (kg)
GPSF40×120-D-H400×400×1200192155023400
GPSF50×120-D-H500×500×1200300155023600


Features

Precise Measurement & C ontrol

Dual-operating system with automatic control and friendly computer interface. Adopt high-precision measurement technology to ensure pressure, temperature, flow and other parameters under precise control. Comprehensive data backup function. Support remote control, remote diagnosis and system maintenance.


High Quality Cylinder Material

Ultra-long service life hard carbon felt insulation chamber with CFC inner liner. Treated in temperature above 2000℃, with high strength and good insulation performance. The resistance detection system can detect failure of the heating system timely and avoid damage to the furnace shell and insulation chamber.



INQUIRY